OSP and field glossary
Plain-language definitions of the terms used across fiber construction and public works.
- Walkout
- A field survey of a proposed route before design. Techs record poles, structures, obstacles and measurements.
- Make-ready
- Work needed before new cable can be placed, such as moving attachments, replacing poles or trimming trees.
- Work print
- The construction drawing crews build from, showing routes, structures and quantities.
- Redline
- A change to the work print made in the field, marked in red so the design can be updated.
- As-built
- The final record of what was actually built, including every redline.
- Unit code
- A billing item with a code, a unit of measure and a rate, such as bore footage by the linear foot.
- LF / EA
- Units of measure. LF is linear feet and EA is each.
- Strand
- The steel messenger wire that aerial fiber is lashed to.
- Lashing
- Wrapping fiber cable to the strand with lashing wire.
- Directional bore
- Drilling a path underground to place duct without trenching.
- Handhole
- An underground box that gives access to cable and splices.
- Splice closure
- A sealed enclosure that protects fiber splices.
- Drop
- The cable that connects the network to a home or building.
- FTTH
- Fiber to the home. A network that runs fiber all the way to each customer.
- Right-of-way
- The strip of land along a road where utilities are allowed to build.
- Storm drain inlet
- The curbside opening that carries runoff into the storm sewer.